Enable Panelists to Pause a Test

Enable Panelists to Pause a Test

Overview

The Pause feature in Compusense is ideal for various scenarios. Here are some examples:
  1. For home use tests where you want to enable panelists to start the test at their convenience (not all panelists can possibly start the test at the same time or even on the same day when testing at home) and work on the next sample the next day.

  2. When you need to enable panelists to take an extended break between back to back Discrimination tests, for example. Discrimination tests are not compatible with the Partial Present feature like Standard tests are, so Pauses should be used instead.

  3. In any test type where an extended break is required before panelists can resume their testing, such as 24 hour break after a hair product application.

You can set automated reminders for panelists to resume the test!

The video below will walk you through a hands-on exercise for setting up a simple Pause that enables panelists to pause the test and resume 2 hours later.


IdeaCheck out our other Text screen videos for different scenarios.



Notes
If you have any questions about any of the content in this video or software in general, please feel free to contact our support team for assistance.



Total run time: 4:47 minutes 

Recorded in: April 2025



Having trouble viewing this video? Click the link below to download a copy (28.8 MB MP4 download)




    • Related Articles

    • Panelists Library

      Overview In order to invite panelists to your tests and to otherwise communicate with panelists from our software, the panelists (their records) need to exist in the Panelists library. You can organize your panelists into panels and subpanels. There ...
    • Run Test

      Overview In the Run test tab, you can set up and review the final details of your test before you start test . Status The status indicates what stage the test is in. Status Name Status Description In design This status indicates that an analyst is ...
    • Scheduling: Canceling or Rescheduling a Test

      Overview You’ve created a Schedule, panelists scheduled themselves, everything went well, but then you found out that the test must be cancelled or rescheduled (e.g. due to weather conditions). Such situation can be quite stressful. This workflow ...
    • Standard Test: Accelerated Shelf-life Testing

      Overview The focus of this workflow is accelerated shelf-life testing using the difference style (Difference From Control) with Category intensity scale. The objective is to see whether the panel can identify a difference in a test sample from a ...
    • Standard Test: Real-time Shelf-life Time Point Testing

      Overview The focus of this workflow is real-time shelf-life time point testing using the difference style (Difference From Control) with Category intensity scale. The objective is to see whether the panel can identify a difference in a test sample ...